If you’ve ever spent time in a stamping, forging, or precision forming facility, you know that bad force measurements don’t just lead to off-spec parts—they lead to broken dies, wasted material, and hours of unplanned downtime. A few months back, I got a call from a mid-sized automotive parts manufacturer that had been using generic load cells on their 200-ton press for years. They were constantly chasing inconsistent rivet formation on door hinges, and every time they swapped out their old sensor, the calibration drifted so much that they had to shut down production for a full shift to re-test. That’s when we sent our lead field tech to walk them through installing a donut load cell—our specialty, the one we’ve refined over 12 years of building sensors for heavy industrial equipment. Donut load cells, sometimes called thru-hole or annular load cells, are perfect for presses because they bolt right in line with the press’s ram and tooling, cutting out the alignment errors that plague side-mounted sensors. Today, I’m pulling back the curtain on exactly how we install these things, the tricks we’ve learned to avoid common pitfalls, and why this sensor is a game-changer for anyone serious about press force measurement. Donut Load Cell

First, a quick reality check: installing a donut load cell isn’t just unbolting an old part and dropping a new one in. These sensors are precision instruments, with tolerance levels measured in thousandths of an inch, and a single misstep can throw their accuracy off by 10% or more—worse than no sensor at all. We always start any install with a pre-site walkthrough, even if the customer swears their press is in good shape. Here’s what we check first: ram runout, parallelism of the bed and platen, and the condition of the mounting holes in both the press ram and tool adapter. I’ve seen customers skip this step and end up with a load cell that’s tilted just enough to measure shear force instead of pure axial force. Shear force is the enemy here—donut load cells are designed to measure only force applied directly along their central axis, and even a tiny side load will skew readings so bad that your QC team will be throwing away good parts and accepting bad ones.
Last year, we had a customer in the appliance industry try to skip the walkthrough. Their press was running blanking operations for dishwasher panels, and they were seeing 15% variation in force readings that they couldn’t explain. When our tech arrived, he measured the ram runout and found it was 0.018 inches—more than three times the maximum runout our load cells are rated for. The customer had been running that press for three years without ever aligning it, so the old side-mounted load cells had just been reading a mix of shear and axial force. Installing a donut load cell without fixing the runout would’ve just given them a new set of wrong numbers. So first step: confirm your press is aligned within the manufacturer’s specifications. For most mechanical and hydraulic presses, that means ram runout of less than 0.005 inches and parallelism between ram and bed within 0.003 inches per foot of travel. If you need to adjust your press, call a service tech—don’t wing it. Even a half-aligned press will ruin a high-quality donut load cell’s performance.
Next, once we’ve confirmed the press is stable, we move to tooling preparation. This is where most first-timers mess up. The donut load cell has to sit between two perfectly flat, parallel surfaces—your press ram on top and your tooling adapter on bottom, or vice versa, depending on how you’ve set up your force path. We always recommend using the load cell as part of the tool stack, not as a separate afterthought. Let’s break that down: when you remove the old press load monitoring hardware, you’ll have two mounting plates—one bolted to the ram, one bolted to the bed. We take those plates, machine or grind their contact surfaces flat within 0.002 inches per inch of diameter, and apply a thin, even coat of anti-seize compound to the surfaces that will touch the load cell. Wait—anti-seize? Why not just leave them bare? Because when you clamp down on the load cell, any tiny burr, chip of old sealant, or bit of rust on the mounting plate will create a high spot that concentrates force, leading to localized stress and premature wear on the load cell. Anti-seize prevents that, and also makes it easier to remove the load cell later for calibration or replacement.
A critical note here: never use shims to adjust the height of the load cell. Shims are another huge source of error. If your mounting plates are not perfectly parallel, grinding or machining them is the only acceptable fix—thick or thin shims will tilt the load cell, creating side loads and throwing off accuracy by 5% or more. I learned that the hard way early in my career, when a customer asked us to install a donut load cell and tried to use a stack of 0.005-inch shims to make up for a bent mounting plate. The first test run showed force readings that were 12% lower than actual, and after pulling the load cell off, we found that the outer edge had been compressed twice as much as the inner edge, causing permanent minor damage to the sensing element. Don’t cut corners here—take the extra 30 minutes to get your mounting surfaces right.
Once the tooling is prepped, we move to the load cell installation itself. The first rule: always hand-run the bolts through the load cell before tightening anything with a wrench. Don’t force bolts through—if they don’t slide in easily, your mounting holes are misaligned, and forcing them will twist the load cell, causing permanent damage. All our donut load cells come with grade 8 or higher bolts, sized to match the through-hole diameter, and we torque them in a crisscross pattern to ensure even clamping pressure. How much torque? That depends on the size of the load cell. For a 10,000-lb capacity load cell, we torque each bolt to 25 ft-lbs; for a 100,000-lb unit, it’s 75 ft-lbs. The key here is to torque evenly, not just tighten all bolts as hard as you can. Tightening one bolt all the way before moving to the next will pull the load cell to one side, creating side loads right out of the gate. Crisscross torque is non-negotiable.
Also, pay attention to the direction of the load cell. All our donut load cells have a marking on the top side that indicates the direction of rated force—always make sure that marking faces the ram (the moving part of the press, where force is applied from) and the bottom side faces the bed. Reverse it, and you’ll get inverted readings that make no sense. We once had a small customer who mixed this up and spent three days troubleshooting why their force readings were negative every time the press ran—turned out the load cell was installed upside down, and the calibration algorithm was measuring force in the opposite direction. Simple mistake, but it cost them a full week of downtime.
Now, wiring and integration. This is the part that ties the load cell readings to your press control system, so it’s just as important as the mechanical install. Our donut load cells come with shielded, reinforced cable designed for industrial environments—no cheap cable that will fray from oil, vibration, or heavy movement. When routing the cable, we always keep it at least 12 inches away from high-voltage power cables, motor leads, and hydraulic lines. Electrical interference (EMI) is one of the biggest unsung causes of bad force readings, and it’s so easy to avoid with basic cable management. Don’t run the load cell cable in the same conduit as your press’s main power wires—this causes signal noise that can make readings jump by hundreds of pounds, even if the load cell is perfectly mounted.
Once the cable is routed, we connect it to our load cell amplifier, which is calibrated to our donut load cells specifically—generic amplifiers never deliver the same accuracy. Then comes the all-important calibration. Here’s where we don’t cut corners: we use a NIST-traceable calibration weight or a portable force standard to verify readings at 25%, 50%, 75%, and 100% of the load cell’s rated capacity. This isn’t just a checkbox—calibration ensures that the readings you see on your HMI match actual force applied to the press. We always do a test run on a dummy part first, not a production part. That way, if there’s a misalignment or wiring error, you don’t waste good material or risk breaking a die.
Wait a second—what about common accessories? We always recommend two add-ons for donut load cell installs: a rubber or silicone boot to cover the load cell and protect it from hydraulic fluid, metal shavings, and dust, and a grounding cable to connect the load cell’s housing to the press’s ground bus. Hydraulic fluid is a load cell’s worst enemy—it can seep into the housing and damage the strain gauges inside over time, and metal shavings can scratch the mounting surfaces, leading to uneven force distribution. The boot is a cheap insurance policy that extends a load cell’s life by years. Grounding is also important—even small static electricity surges from the press can fry the strain gauges inside a load cell, so a solid ground connection is non-negotiable.
Now, let’s talk about post-install checks, because even if you do everything right, you might need to tweak things. The first test after installation should be a dry run: move the press through its full travel without any material in the die, and watch the force readings. If the reading jumps up or down more than 2% during travel, that means there’s side load from misalignment, or the mounting bolts were torched unevenly. If the reading is zero when the press is at rest, that’s a sign of good initial setup—drift from zero usually means the load cell wasn’t clamped evenly, or there’s a high spot on the mounting plate.
I want to share a recent success story that shows why this process works. A customer in the aerospace industry called us after a bad batch of landing gear fittings, where the press had applied 10% more force than the control system indicated, leading to parts that were too weak and had to be scrapped. They’d been using side-mounted load cells for 15 years, and they’d tried three different brands of load cells with no luck. We sent our team to install a 200,000-lb donut load cell between their ram and die, walked them through the install steps, and calibrated it to their existing control system. In the first production run, their force readings were accurate to within 0.5%, zero scrap on that part, and they’ve cut their press calibration time from 8 hours per week to 30 minutes per month. They’ve since ordered six more load cells for other presses in their facility. That’s the difference between a good install and a great one.
Now, what are the most common mistakes we see customers make when installing donut load cells? Let’s list them out, because avoiding these will save you a lot of headaches. First: skipping pre-install press alignment checks. Second: using shims to adjust mounting height. Third: torquing bolts unevenly or not to the correct specification. Fourth: routing cables near high-voltage leads, causing EMI noise. Fifth: not protecting the load cell from environmental contaminants like fluid and metal shavings. Sixth: calibrating only at full capacity, not at intermediate points. All of these mistakes add up to readings that are unreliable, and can even damage the load cell or your press over time.

If you’re thinking about upgrading your press force measurement, or you’re replacing a worn-out load cell, the install process isn’t as complicated as it sounds—if you follow the right steps. But here’s the thing: donut load cells are specialized equipment, and their performance depends entirely on how they’re installed. A poorly installed load cell is no better than no load cell at all, and it can cost you more in downtime and scrap than the cost of the sensor itself. We’ve been designing and installing donut load cells for industrial presses for over a decade, and we know exactly what works and what doesn’t. If you’re planning an install, or you’ve tried installing a donut load cell and your readings are off, our team is here to help. We can walk you through the process over the phone, send a field tech to your facility, or supply you with calibrated sensors and all the accessories you need to get the job done right. Don’t let bad force measurements derail your production—reach out to us to discuss your press force monitoring needs today.
Static Torque Sensor References
- Load Cell Fundamentals, Omega Engineering, 2022
- Industrial Press Alignment Best Practices, American Machine Tool Distributors’ Association, 2021
- Strain Gauge Load Cell Installation and Calibration, National Institute of Standards and Technology (NIST), 2020
- Heavy-Duty Load Cell Environmental Protection Guidelines, Sensor Technology Association, 2023
Huzhou Zhihe Technology Co., Ltd.
We’re well-known as one of the leading donut load cell manufacturers and suppliers in China, also support custom service. Please feel free to wholesale high quality donut load cell made in China here from our factory. For more information, contact us now.
Address: Science and Technology Park, No.333 Changhong Middle Street, Fuxi, Deqing,Zhejiang, China (Moganshan National High-tech Zone)
E-mail: Fonda@zhihe-tech.com
WebSite: https://www.zhihe-tech.com/